| A
new theatre located on the site of the existing, the
internal volumes are a response to the tight site conditions.
Perceived as a performance drum, the entrances (2 levels),
bars and restaurant, offices and stage facilities are
all attached to but separate from the ‘Drum’.
Separation by roof glazing allows the ingress of natural
light and a powerful expression of the interior and
activity by night, achieved by ensuring illumination
of surfaces in an appropriate manner.
|